STATUS:
Ongoing / Planned Commissioning Date: January 2024
DESCRIPTION:
- 3.4 MWp Solar Power Plant
- 10 x 320KVA On-grid Inverters
- 4 MWh Containarized Lithium Storage
- 3 MVA PCS Capacity
- 6 x 715KVA Synchronized Diesel Generators
- High End Workshop and Training Center
- Contruction of 16Km 33KV Upstream Transmission Line
- Construction of 6Km 11KV Downstream Transmission network with Powerhouse and 6 x 500KVA Transformers
- Smart Prepaid Metering System
- Advanced Metering Infrastructure (AMI)
- Advanced SCADA and EMS Solutions